Super Typhoon Meranti, the 14th typhoon of 2016, made landfall in Fujian on September 14, 2016. The power facilities of Fujian power grid were seriously damaged, causing large areas of power failure in Xiamen, Quanzhou, Zhangzhou and other places. As the typhoon came during the Mid-autumn Festival, and in order to ensure the timely and effective supply of emergency materials for power line repair of the affected areas, our company made a positive response to the demand of Fujian Electric Power Company Supply Chain Operation Center in the first time, organized employees to work overtime all night to produce and ship emergency relief and power line repair materials. We tried to overcome the difficulties of traffic interruption and poor communication, raced against time, and assigned dedicated personnel and vehicles for shipment. The emergency materials were delivered...
In the first half of 2020, the epidemic of New Coronavirus infection was threatening to spread all over the world, which posed severe challenges to the construction of the Pakistan Lahore 660kV project. Our company overcame the adverse effects of the epidemic situation, closely organized and completed the production and delivery of porcelain insulators on schedule. Recently, the company received a letter of thanks from China Power Technology Equipment Co., Ltd. Thank our company for ensuring the on-site construction progress and showing a high sense of responsibility and professional performance ability!...